Inventory redevelopment project home page (Project 269)

Review project (2012)
Project 146 - Inventory Improvements
Consultation (Aug 2013)
Schema diagram, Schema,Notes
Consultation (Sep 2013)
Technical talk slides, schema A, schema B, schema C (post meeting),Notes from technical meeting 10/09/13
Consultation (Oct 2013)
User meeting slides,Notes from user meeting 02/10/13
Latest Design (Jan 2014)
work flow, schema, schema types
Development meeting talks
05/04/2017,02/08/2017
Other documents
OrderFileFormatDetails, OrderFileFormat, InvProjectTheonDiscuss, InvProjectRESTapi, InvProjectFeedback
Blog articles
Alastair's blog
Bugs
in bugzilla.inf
Deliverables
InventoryProject269Deliverables

Misc deliverables

  • API for retrieving information on active/dead machines - see RT 64667
  • Visitor machine reports that report upcoming departures with associated kit that will become free
  • Record network switch locations (can use MIB report for this, but would need to standardise switch locations first)
    • and link switch modules to the switch chassis they're currently in - can do automatically from MIB report
  • (Not a deliverable - but need to remember) - need a procedure for dealing with serial numbers changing when kit replaced under warranty

-- AlastairScobie - 15 Oct 2013

Topic revision: r23 - 02 Aug 2017 - 09:03:16 - AlastairScobie
 
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback
This Wiki uses Cookies