Please fill in actual activity for Last Month (June) and intended activity for This Month (July) for projects you are responsible for. For reference, the intended activity recorded for June is included where an entry had been made (it is considered unhelpful to alter this to match what actual activity was :). It is acceptable to change devproj milestones as part of this process, however if you do please indicate that you have done so below, for example by adding a Change of Plan bullet point, so that the meeting is alerted to the changes.

  • Revisit Account Management
    • June: Wait for dependency (#164 AFS test suites)
    • Last Month: Wait for dependency (#164 AFS test suites)
    • This Month: Wait for dependency (#164 AFS test suites)

  • Inventory Improvement
    • June: Produce proposal for schema (and general architecture). Continue prototyping
    • Last Month:
    • This Month:

  • Password strength checks
    • June: Really really test the plugin
    • Last Month: Still didn't get this done
    • This Month: Really test the plugin

  • Account reconciliation
    • June: Continue deletions. Consider sweep through data and disabling of all accounts which exceed enddate + grace period.
    • Last Month: All deletions done - 1674 for the moment. We've now moved on to disabling accounts which are past their end-date + grace-period. This will help us with general data tidying. ~80 of ~800 disabled so far.
    • This Month: Continue disabling of expired accounts

  • School Database Revamp: Phase 1B & 2B
    • June: Complete drift correction and stage 2 diff checks. Hopefully start on stage 3 diff checks (diverge the XSD generation but DDL should remain identical). Schematic - ongoing design.
    • Last Month: Drift correction completed (for details see Trac#799). Stage 2 diff checks completed. Not much else due to absence.
    • This Month: Start Stage 3 diff checks, including system catalog load and sync testing.

  • User accessible login reports
    • June: Finish documenting code. Write up admin notes. Write project report.
    • Last Month: Finished documentation. Wrote final report
    • This Month: Sign Off

  • Software Download Portal/Repository: Stage 1
    • June: Survey has two more weeks to run, then meet with David Richardson & Angus Stewart-Liddon (Edinburgh Research and Innovation) for final analysis. Prepare final report.
    • Last Month: sent targeted reminder for ISDD to staff, emphasising requirement to publish or advertise software; survey results awaited (Informatics results requested)
    • This Month: meet with David Richardson & Angus Stewart-Liddon (Edinburgh Research and Innovation) for final analysis. Prepare final report.

  • Streaming Media Service Requirements
    • June: Complete draft report document and check with interested parties.
    • Last Month: Installed Darwin Streaming Server on bjorling.inf, experimented with streaming various file types, further user consultation.
    • This Month: Complete draft report document.

  • Lifecycle code design
    • June: Develop prototype according to decisions made.
    • Last Month: Prototype code developed and tested - seems to do what we want.
    • This Month: Get code into state it can be submitted for code-review. Do some testing of code on test prometheus server.

  • Investigate AFS on ECDF storage
    • June: AFS test cell, some playing with a local GPFS, or ECDF's if I've got access by then.
    • Last Month: Small amount of experimenting with GPFS. Also early looks a ZFS. Operational stuff got in the way.
    • This Month: See about ECDFs access, and try to get ZFS going.

  • LCFG client refactor - code cleanup
    • June: Finish API documentation. Finish tests.
    • Last Month: Not much happened due to SL6.4 upgrade
    • This Month: Finish API documentation. Finish tests. Write up final report.

  • Replace CVS with SVN on www.inf
    • June: Finish testing, confirm preferred DB-generated file integration option and switchover schedule.
    • Last Month: Not much, awaiting result of discussions with RaT Unit re separation of DB stuff
    • This Month: Produce planning document for future implementation if blocked, or arrange switchover schedule if not.

-- TimColles - 26 Jun 2013

Topic revision: r9 - 05 Aug 2013 - 11:35:45 - IanDurkacz
 
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback
This Wiki uses Cookies