Resourced projects for 2013 T1 (January to April)

Currently active projects

Existing projects which have been allocated further effort in T1.

Project details Project title
   
112 School Database revamp
207 School DB revamp - phase 2B
75 Prometheus
144 Redevelop user documentation
192 Introduction of Drupal as new commodity WCMS
206 Coltex revamp
182 Account reconciliation
229 Windows 7 upgrade for admin desktops
219 SL6 upgrade for service unit servers
223 KDC upgrade to 1.9
197 Review roles mechanism
228 ISS misc development (eg reports)
249 Documentation effort - HOC
194 Data archiving - produce report
168 Password strength checks
227 Extend media server (requirement capture)
205 Webmark Reform
256 VM/Cloud survey
258 Software download portal/repository (requirement capture)
180 KDC rekey
103 Scanning for compromised machines
225 LCFG client component cleanup
254 User accessible login logs

New project proposals for T1

New projects which have been allocated effort in T1

Project details Project title
   
269 Redevelop school inventory system
262 Prometheus Lifecycle code design
260 Review of authentication technology
267 OpenLDAP DICE client configuration
268 Investigate AFS on ECDF storage
261 Lab exam virtual image
226 Upgrade core inf server to SVN from CVS
234 Increasing energy savings from DICE desktops
Production GIT service

-- AlastairScobie - 07 Dec 2012

Topic revision: r1 - 07 Dec 2012 - 13:29:12 - AlastairScobie
 
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback
This Wiki uses Cookies